Search Issue Tracker
Won't Fix
Won't Fix in 2023.3.X
Votes
2
Found in
2022.3.7f1
2023.1.8f1
2023.2.0b4
2023.3.0a3
Issue ID
UUM-45383
Regression
Yes
Children of a Prefab change order in the Hierarchy after changing the Editor version
How to reproduce:
1. Open the “IN-49246_repro.zip“
2. Open the “BasePrefabVeriant“ asset and observe its child objects in the Hierarchy
3. Upgrade the Editor version
4. Open the “BasePrefabVeriant“ asset and observe its child objects in the Hierarchy
Expected result: The order of the child objects is the same
Actual result: The order of the child objects is different
Reproducible with: 2022.1.0a15, 2022.3.7f1, 2023.1.8f1, 2023.2.0b4
Not reproducible with: 2021.3.29f1, 2022.1.0a14
Reproducible on: Windows 10
Add comment
All about bugs
View bugs we have successfully reproduced, and vote for the bugs you want to see fixed most urgently.
Latest issues
- Build fails when building a project containing an 18+ dimension array with IL2CPP
- [Android][Sentis] Human poses are not detected when using the BlazePose model
- Sprite Editor Outline Tool Overlay is not displayed when no Sprite is selected
- “No method with RuntimeInitializeOnLoadMethod attribute” warning from ReadmeEditor.cs is thrown after installing Project Auditor Rules
- Projection matrix is altered when using RasterCommandBuffer.ClearRenderTarget on DX12 and Metal
Resolution Note:
Restructuring Prefabs not supported in 2022.1.0a14 or before.
Resolution Note (2023.3.X):
Restructuring Prefabs not supported in 2022.1.0a14 or before.