CalculatePath() fails to find a path between two valid connected locations
Steps to reproduce:
1. Open the attached project(PathBug.zip)
2. Open the Assets/BadPath.unity scene
3. Play the scene (Ensure the Navigation Window is selected in the Editor)
4. Observe the Console Window and the Navigation Window:
A valid NavMesh is produced which covers and links both red points
No path is found between the two red points
The logging shows the NavMesh is valid, the two red points are valid, but the is no path found
Expected result: CalculatePath() should find a path between two valid connected locations
Actual result: CalculatePath() fails to find a path between two valid connected locations
Reproduced with: 2017.1.0b9, 2017.1.0b10, 2017.2.0a4
Not reproduced with: 5.5.4p1, 5.6.2f1, 2017.1.0b8
Regression introduced in: 2017.1.0b9
All about bugs
View bugs we have successfully reproduced, and vote for the bugs you want to see fixed most urgently.
Latest issues
- Texture2D hash changes inside of an AssetBundle when rebuilding a SpriteAtlas bundle with an empty AssetPostprocessor Script enabled
- Aniso Level still applies when Generate MipMap is disabled in Texture Import Settings
- Mipmap Limit Groups long names are not truncated when creating a new Mipmap Limit Group with a long name
- “ArgumentException: Invalid double parameter.” error is thrown when Infinity is typed into the Fixed Timestep field
- GameObject becomes gray when using HDRP and STP together on macOS
Add comment